Workspace
The calculator's own fields, action and results arrive with the verified pack when you load it. Nothing is computed in this page.
Express a mix design in the unit a site can count: bags per batch, the volume a batch makes, and the concrete each bag of cement is responsible for.
The calculator's own fields, action and results arrive with the verified pack when you load it. Nothing is computed in this page.
A mix design specifies cement content: kilograms of cement per cubic metre of finished concrete. It is the right unit for a specification and the wrong one for a mixer, where the material arrives in bags of a standard mass and is counted rather than weighed.
Dividing the batch cement mass by the design cement content gives the volume that batch should produce. Dividing it by the bag mass gives the number of bags in it. Dividing one by the other gives yield per bag: the concrete a single bag of cement is responsible for.
That last figure is the useful one, because it is stable. It does not change with batch size, it can be checked against what actually came out of the mixer, and a site team can hold it in their head. If a batch of six bags does not fill what six bags should fill, the batching has drifted — usually aggregate, usually moisture.
This is a yield CHECK, not a mix design. It takes a cement content that a design already established and expresses it in field units. It cannot tell you whether that cement content was right.
A bag count also assumes the bags are still cement. Cement is hygroscopic: stored off a pallet, unwrapped, or through a humid season, it pulls moisture from the air and air-sets into lumps of partially hydrated clinker. A bag with hard lumps that do not crumble in the hand has already spent part of its binding capacity, and no count of such bags reproduces the designed content.
A site batch is made up with a whole number of standard bags, against a mix design written to an ordinary structural cement content.
The bag count is what to hand the mixer operator. The batch yield is the volume that batch should fill, and the yield per bag is the figure to check against reality on the next pour. If the concrete consistently falls short of the batch yield, the cement content being achieved is higher than the design — the mix is richer and more expensive than intended, and that usually means aggregate is being under-measured.
The figures are produced by the certified engine when the calculator loads, from this pack’s own declared example. Nothing on this page is a stored answer.
The total cement going into one batch, however it is measured. Where supplementary cementitious materials are used, this is the cement alone unless the design’s content was written on a total-cementitious basis — the two bases are not interchangeable and mixing them shifts the yield without any sign that it has.
The mass of one bag as supplied. It is regional: the same nominal bag is a different mass in different markets, and a bag count carried between them is a quiet error.
Kilograms of cement per cubic metre of finished concrete, from the mix design or the durability class being worked to. This is the figure the check is made against — it is an input to the calculation, never an output of it.
ASTM C138/C138M — Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete
Batch-yield check against the mix design’s cement content
The citation travels inside the signed pack and is displayed from the verified leaf, not transcribed here. What you see rendered with the result is what was signed.