Workspace
The calculator's own fields, action and results arrive with the verified pack when you load it. Nothing is computed in this page.
Turn a roof-plane area into an asphalt shingle order: bundles to buy, from the area to cover, a cutting-waste allowance, and the coverage on the bundle.
The calculator's own fields, action and results arrive with the verified pack when you load it. Nothing is computed in this page.
A shingle covers less than its own face. Each course overlaps the one below so that water always lands on shingle, never on the joint beneath, and the part left showing — the exposure — is all the coverage a course contributes. Bundle coverage as printed by the manufacturer already accounts for the designed exposure, which is why the take-off can work directly in covered area without knowing the shingle’s dimensions. Coverage is a property of the specific product, and the number on the wrapper wins.
The commonly cited default — three bundles to the square, so a bundle covers a third of a hundred square feet — describes the mainstream asphalt product and no more. Heavier laminated shingles can pack four or more bundles to the square because a bundle must stay liftable, so using the default for a premium product quietly understates the order — exactly the error an explicit coverage input exists to prevent.
Waste on a shingle roof is not carelessness; it is geometry arriving course by course. Every course starts or ends at a rake with a cut piece; valleys consume shingles diagonally; hips and ridges are capped with shingles cut down unless a dedicated cap product is bought; a starter course runs along every eave before the first visible course exists. The ten percent default suits a simple gable; cut-up roofs earn more, and the allowance is where a prudent estimator hides the bundles repairs will eventually want.
The engine reports the demand both ways: the raw bundle figure, fractional and exact, and the whole-bundle count rounded up for the order. A raw figure just over a whole number says the last bundle is almost entirely spare — no reason to cut the order. One crowding the next whole number says the waste assumption, not the arithmetic, decides whether the crew runs short on a Friday afternoon.
What the bundle count leaves out is the rest of the roofing system, on purpose. Underlayment, starter strips, ridge caps, drip edge, flashing and fasteners each have their own units and their own take-offs — the underlayment calculator ships in this same signed pack — and folding them in would only blur what this number is: the field shingles, nothing else. It is an order quantity, not a statement about a product’s suitability for a pitch or climate; the wrapper and the construction documents carry those questions.
Finish the cluster’s reference job: the plane area from the gable layout page carried in unchanged, the ten percent default waste appropriate to its two plain planes, and a mainstream three-bundle-per-square shingle at the default coverage.
The raw figure is the roof’s exact appetite in bundles; the count to order rounds it up to whole bundles, because no merchant splits one. Set the two side by side before ordering: how much of the last bundle the roof truly needs is the margin the order already contains, over and above the stated waste.
Now lower the coverage input toward a four-bundle-per-square figure and watch the order climb with the area untouched. The same experiment on the waste input tells you which assumption your roof is most sensitive to — simple gables, usually coverage; cut-up roofs, waste.
The sloped area to be shingled, in square feet — carried forward from the gable layout page or measured along the slope on site. It should already include overhangs and the pitch stretch; a footprint figure here shorts the order twice over.
The percentage added for rake cuts, valley and hip consumption, starter courses and spoiled shingles. Ten percent is the commonly cited figure for a plain gable; valleys, dormers and many small planes justify more, and an allowance is cheaper to state here than to discover as a second delivery charge.
The covered area one bundle of the chosen product lays, in square feet, taken from the manufacturer’s wrapper or datasheet. The default expresses the classic three-bundles-per-square asphalt shingle; laminated, oversized and specialty products differ, and this input is how the take-off is told which shingle is actually on the truck.
Standard roofing take-off arithmetic (three-bundles-per-square convention)
Bundle demand as covered area grossed up by the waste percentage and divided by per-bundle coverage; the order quantity as that demand rounded up to whole bundles, with the unrounded figure reported beside it.
Quantity reference to be verified against the construction documents and the professionals responsible for the roof; product suitability is never determined here. The signed pack carries its own citation, and the page reports the verification state of the release it mounted.